Back to article list

First call under new subsidy programme: GREENGAS

Within its Modernisation Fund, the State Fund for the Environment has started to accept applications under GREENGAS Call No. 1/2024. This new subsidy programme supports the introduction and use of renewable gaseous and liquid fuels or raw materials.

Applications for support will be accepted from 20 January to 30 June 2025. The programme, intended also for large businesses, aims to provide support for the installation of new electrolysers to:
  • produce hydrogen from renewable sources without the possibility of supplying electricity to the electricity grid or
  • accumulate electricity into hydrogen where the electricity is produced from renewable sources of non-biological origin, with the possibility of supplying electricity to the electricity grid.
 
The funds for allocation are CZK 3 billion (with a priority allocation of CZK 1 billion intended for the Moravian-Silesian, Ústí nad Labem, and Karlovy Vary regions). The maximum aid intensity is 30-45% of eligible costs depending on the specific activity. Support is available for expenses incurred for a comprehensive system of equipment that will produce hydrogen by electrolysis, i.e., a water treatment system, an electrolyser, power and control electronics, an electrolyser support system, hydrogen refining subsystems, hydrogen storage equipment, and hydrogen bottling equipment.
 
The project must be completed no later than 60 months after a decision to grant the subsidy is issued. It may be implemented throughout the Czech Republic.
 
If you are interested, we will be happy to provide you with more information and help you with the preparation of your application.